City Of College Park Pedestrian Bridge over Camp Creek Parkway to connect Gateway Center Hotels, Offices, Convention Center, & Arena to Downtown & MARTA via lighted, paved sidewalk

The Conceptual Plan

for the Bridge

North Walkway Ramp

to the Arch 

1. Facing North

2. Facing South

1.

2.

The Arch Structure is Erected - 10/5/2024

Walkway Floor Frame Built to the Edge of the Highway - 11/11/2024

Walkway Floor Frame Built Across Highway-11/16/2024

Walkway Sub-flooring

in Place 11/22/2024

Walkway Rebar In Place 11/28/2024